Day 11 started at the final finish area of the Belmont painting facility.  The rest of the items that needed installation after painting were done.


Installing our roof ladder



Installing slide toppers and awnings





Entry handle with keyless entry pad



Reinstalling taillight assemblies



Installing radiator grille



Getting axle weights




The coach was then driven back to the main plant in Red Bay for final finish and inspections at that facility.


The coach ended day 11 at the tile repair station.